Tuesday, April 12, 2011

PWK class week-11 2011

I have continued on my box as I have been researching different types of joints. I have also filled/bogged the screw holes and sanded them off. The original time i bogged it There was to little hardener so I scraped it out and did it again with more hardener. My box went together very well with little trouble.

Sunday, April 10, 2011

PWK class week-10 2011

Week 10

- We started to build our boxes. We are using both Butt Joints and Miter joints to test how each one looks and how to put together. we are using 3.2 drill bits and self taping screws. We are pre-drilling the holes so that its easier to drill and so the box is also square. We glued the miter joints together and Bogged the holes.

Problem In-counted: Two holes on one side of the box splinted because i didn't drill deep enough before placing in screws.
Problem Solved: The teacher told me to drill two new holes next to the previous ones and bog the old holes.

To do- Sand down boxes.

Monday, April 4, 2011

PWK class week-9 2011

We continued our designs and cut out the sections of wood for our example boxes to get a realistic idea for the sizes involved with these speaker cabinets. I continued on with my designs and ceated a list of designs that i would

Saturday, April 2, 2011

PWK class week-8 2011

We are doing our design work on A3 paper so we can get a understanding of different designs and proportions. We also did the Brief for this project so we could understand what we are to do over the next year.

Problem encountered: The design I was thinking of getting is to time consuming for the amount of time i have to do the designs and work over the next year.

Solved how?: I decided to use a easier design to create a easier project of myself.